Logo DarkLogo Light

Service Category: <span>CASS of Dynamic Equipment</span>

CAss of Machine Train

Condition Assessment (CAss) of machine train includes condition assessment of different components of each machine in machine train. When more than two or more machines Machines are coupled to each other with same axis of their shafts, the assembly is called Machine Train. Yearly CAss of parts of all the machines in machine train is necessary, if those are not covered under PdM.
Read More

CAss of Crane/Conveyor

Conveyors Condition Assessment includes thorough inspection of bearings, bearing fittings with Thermal & Ultrasound Inspection. The Overhead Crane Main Hoist Motor, Bridge Drive Motor, Bridge idler Wheels, can be inspected with Thermal & Ultrasound Inspection.
Read More
Open chat